This new extension provided a much-needed Reception at Spalding Parish C of E School. The Client contacted SRA and asked for our assistance in ensuring their scheme would meet the latest Fire Safety Standards. After reviewing the project our team were tasked with adapting the design to ensure it met the minimum standard defined by the Building Regulations, and meeting Fire Safety Standards.
The extension involved the creation of a new secure Lobby to protect students and staff, along with a new dedicated Reception area. A bespoke Reception desk was designed, complete with matching sliding hatch to provide a functional and usable entrance space. The large curtain wall façade was incorporated to maximise light and provide a striking feature to the school. SRA oversaw the production of Building Regulations Documents, Tender Documents and On-Site management of the project.