Our team oversaw the design and construction phases for the refurbishment of two sperate Toilet blocks at a Secondary School in Nottingham. As part of the scheme, the former separate Boys and Girls toilets were converted to two Gender Neutral facilities, providing better access to Student Toilets within the school overall.
SRA conducted a full measured and photographic survey to ensure the space was utilised to its maximum. A bright and airy colour scheme was employed, along with high specification LED lighting and ventilation system. A series of vision panels were also introduced to improve safeguarding standards and to monitor student behaviour.
A series of site visits were conducted by our team during the construction phase to ensure a high standard of project delivery, both to time and budget also.